Administration Building Updates

CSD Administration Building Remodel Project


In the early morning hours of February 20, 2015, the Cosumnes Community Services District Administration Building suffered significant fire damage. Located at 8820 Elk Grove Blvd., the 94-year-old building was a familiar landmark in the community. While retaining a significant portion of the historically-significant brick exterior walls, much of the damaged roof, building systems and interiors will be replaced with new construction in order to transform the building into contemporary and energy-efficient office space.

MFDB Architects, Inc. developed a comprehensive design plan that will 
better use the existing square footage, modernize the space, and provide amenities that are desirable to staff. Diede Construction, Inc. will begin project construction in June 2017 with an estimated 12-14 month construction period.


Construction Continues


Much has happened since our last update of the Administration Building Remodel Project! Diede Construction, Inc. continues to reinforce existing footings and install the floor in the main building. Excavation for back flow device, fire hydrants and water line trenching began in the front of the building, and footings and rebar were installed in the basement. During the excavation, there were a few things of the past exposed, including a 1,500-gallon oil tank, old dry well and a septic tank. All three issues were resolved and/or removed per environmental guidelines. The footings on the south side are excavated and filled with rebar in preparation for concrete, as well as the elevator shaft and concrete walls.

After a slight set back from weather, carpenters have been busy framing and installing roof sheathing. You can now see the red iron columns and wall framing in all three sections of the building! If weather allows for roof construction, truss installation will be completed by February.

Phase Schedule

Phase Progress
Concept Plan

Complete
View Staff Report (PDF) 

Schematic Design Complete
Design Development

Complete

Construction Document Complete
Bidding and Bid Award Complete
Contract Finalization Complete
Project Construction Est. Completion: Summer 2018
If you have further questions or media requests, please contact Priscilla Oliver, Facilities Manager, at 916-405-5300.